Caldwell contracting is a roofing contractor and disclaims liability for any difficulties or loss due to lack of knowledge of masonry and framing systems.
Brick wall to roof detail.
Exterior wall parapet rafters prep.
Wall system brick veneer cmu backup rigid insulation w taped joints veneer ties november 30 2015 01 030 0231.
Brick veneer cmu backup rigid insul.
Detail for attachment to metal panel siding or fascia.
To wall sloped roof no overhang ledger support.
Detail 2 3 brick veneer concrete block detail at low parapet with protected roof membrane detail 2 4 brick veneer concrete block detail at high parapet detail 2 5 brick veneer concrete block detail at high parapet.
Flat roof and flashing against brick wall install base flashing under shingles or over metal roofing material.
As a result most typical construction does not use any type of through the wall flashing which results in leaky wall complaints.
That lip is then set into a reglet or groove in this case cut into the mortar joint of the brick wall above.
If the roof runs flat up against the brick wall you must install the roof side of the flashing either under the last layer of shingles or over the roof material if it is metal.
There have always been problems with the flashing details at the roof to wall intersections of head walls rake walls and chimneys especially if brick or stone veneer or stucco is used.
Roof detail high wall low roof 01 030 0804.
W taped joints veneer ties.
Roof detail pitched roof to high wall 01 030 0751.
Wall system brick block wall 2in spray foam.
The current flashing details in the 2013 international residential code irc for sloped roof wall intersections are very difficult to construct.